Tennis Pavilion progresses

Since the the foundations were completed work has been progressing well.

The concrete beam and block slab is lifted into place and assembled

The concrete beam and block slab is lifted into place and assembled

IMG_5786.jpg
The structural block work walls and steels are erected.

The structural block work walls and steels are erected.

Ready for in situ concrete first floor slab.